Still Out There at Two O’Clock

Every shop project starts the same way. I plan to get it done in the morning. I’m still out there at two in the afternoon, sawdust all over my clothes, wondering where the day went.

I do project work for a living. I know better. And yet the pattern holds, Saturday after Saturday.

For about a year, my to-do list had a single line on it: clean the shop.

Three words. No next step, nothing I could actually pick up a tool and do. So it sat there, week after week, quietly judging me every time I scrolled past. At work I’d never let a project live like that. A line item with no next step is a wish. At home, I let it ride.

So I finally did at home what I’d do at the office. I asked what had to happen first for the shop to be usable. The answer was obvious once I asked it. Lumber was stacked on the floor, leaning all over the wall, blocking the table saw and the floor. Nothing else could happen until the wood had a home.

That gave me phase one: a lumber rack, scoped to about two hours. Something I could finish before lunch.

The build took about two hours. Right on target. I was pleased with that part.

Then I started installing it.

Getting the racks on the wall, loading the lumber, and reorganizing what was left underneath took another hour and a half. None of that was in my estimate. I’d scoped the fun part, the saw and the drill, and forgotten the part where the thing actually has to go into service.

That’s the exact mistake I’ve watched teams make for years. The build gets planned. The rollout gets assumed. A project isn’t done when the thing is built. It’s done when it’s doing its job, and if the estimate only covers the building, the gap shows up on a Saturday afternoon when you thought you’d be finished.

The racks are on the wall now. Every board I wanted up there is up, and the rest is stored neatly under the table saw. It came out exactly the way I pictured it. It just took longer than I planned, for a completely predictable reason.

And “the shop” isn’t one vague line anymore. The next item is a shelf for my tool batteries. That’s a real task. I can scope it, rollout included.

Leave a Reply